WV Corridor H - The Route
The Route - Davis to Bismarck
July - September 2010 Status:

The WVDOH received approval of the Amended Record of Decision in April 2001. Final design is underway for the 16.2-Mile Davis to Bismarck section in Tucker and Grant Counties.

A grade and drain contract, including a bridge, 0.35 mile east of WV 93 to 0.4 mile east of the WV 42/WV 93 intersection, is anticipated to be advertised in early 2011, and a separate paving contract for that section is anticipated to be completed in fall 2013.

The WVDOH anticipates that the Davis to Bismarck section of Corridor H may be completed in late 2018.


Back
Entire Map (135k)

This map is not to scale nor is it an accurate geographic representation of the area. This graphic is for planning and public information purposes only. Distances area approximated to the nearest alignment point.

The above graphic is a portion of the whole map. Please click here to view the entire map at full-size (135k).

If you would like a very detailed description of a certain area, please contact us and we will be happy to provide you with that information.

top of page

West Virginia Department of Transportation West Virginia

Route | Environment | Culture | Economics | Engineering | Safety | Press | Resource | Home
email us your comments or questions
Copyright © 2003 Corridor H, West Virginia Division of Highways. All Rights Reserved.