WV Corridor H - The Route
The Route - Bismarck to Forman
October – December 2013 Status:

The WVDOH received approval of the Amended Record of Decision in May 2001. Final design is complete for the 14.5-mile Bismarck to Forman section in Grant County.

Construction is underway for the entire length of the Bismarck to Foreman section. In October 2010 the WVDOH opened Corridor H from Knobley Road (Grant CR 3) to Moorefield. Paving is underway from Grant CR 1 to Knobley Road to Bismarck (at the top of the hill), with the first 5.3 miles from Knobley Road to WV 93 opened to traffic in late 2012 and the remaining 4.05 miles anticipated to be completed in the fall of 2013.

The WVDOH anticipates that the Bismarck to Forman section of Corridor H may be completed in fall 2013.


Back
Entire Map (135k)

This map is not to scale nor is it an accurate geographic representation of the area. This graphic is for planning and public information purposes only. Distances area approximated to the nearest alignment point.

The above graphic is a portion of the whole map. Please click here to view the entire map at full-size (135k).

If you would like a very detailed description of a certain area, please contact us and we will be happy to provide you with that information.

top of page

West Virginia Department of Transportation West Virginia

Route> | Environment | Culture | Economics | Engineering | Safety | Press | Resource | Home
email us your comments or questions
Copyright © 2003 Corridor H, West Virginia Division of Highways. All Rights Reserved.